01What it is
The statuses are New, Assigned, In progress, Resolved and Closed. Assigned requires a named contractor, an employee or an external one. You change the status on the fault record, with a short remark.
Resolving sets the resolution date, and reopening the fault clears it. A closed fault changes only by status, so its data is protected.
The priority (Low, Normal, High, Urgent) and the due date show what is most urgent. The counters above the list show faults that are open, urgent, overdue and resolved in the last 30 days.
The contractor receives an email about the assignment. The reporter receives an email when the fault is resolved or closed, unless they performed that action themselves.
- FIVE STATUSES
- New, Assigned, In progress, Resolved, Closed.
- CONTRACTOR REQUIRED
- The status Assigned requires a contractor.
- RESOLUTION DATE
- Set on resolving and cleared on reopening.
- CLOSED
- A closed fault changes only by status.
02Tasks step by step
- STEP 1Open the fault record from the list.
- STEP 2Name the contractor and change the status to Assigned.
- STEP 3When work starts, change the status to In progress and add a remark.
- STEP 4After the repair, change the status to Resolved.
- STEP 1Open the record of a fault with the status Resolved.
- STEP 2Change the status to Closed.
03What it connects to
History and costs
Every status change is saved in the history.
Go to the topicHistory and costs