Priority and status. Mivare Facility Help Centre
AREA 05 · FAULTS AND SITE MAINTENANCE · TOPIC 02

Priority and status

A fault goes from report to closure through five statuses. The system makes sure an assigned fault has a contractor.

IN THE APP
Operations › Faults › fault record
SCREEN
Fault record
STATUSES
Five steps from New to Closed
PRIORITY
Low to Urgent
CONNECTIONS
2 modules

01What it is

The statuses are New, Assigned, In progress, Resolved and Closed. Assigned requires a named contractor, an employee or an external one. You change the status on the fault record, with a short remark.

Resolving sets the resolution date, and reopening the fault clears it. A closed fault changes only by status, so its data is protected.

The priority (Low, Normal, High, Urgent) and the due date show what is most urgent. The counters above the list show faults that are open, urgent, overdue and resolved in the last 30 days.

The contractor receives an email about the assignment. The reporter receives an email when the fault is resolved or closed, unless they performed that action themselves.

FIVE STATUSES
New, Assigned, In progress, Resolved, Closed.
CONTRACTOR REQUIRED
The status Assigned requires a contractor.
RESOLUTION DATE
Set on resolving and cleared on reopening.
CLOSED
A closed fault changes only by status.

02Tasks step by step

  1. STEP 1Open the fault record from the list.
  2. STEP 2Name the contractor and change the status to Assigned.
  3. STEP 3When work starts, change the status to In progress and add a remark.
  4. STEP 4After the repair, change the status to Resolved.

03What it connects to

FAULTS AND SITE MAINTENANCE

Fault report

A fault starts from a report.

Go to the topicFault report