Skip to content
MIVARE LABS FACILITY A SYSTEM FOR CLEANING AND FACILITY SERVICES COMPANIES
05 / FAULTS AND PROPERTY MAINTENANCE · Mivare Facility
05 / FAULTS AND PROPERTY MAINTENANCE

A fault that has been noticed should never go unanswered.

Take in a report from your team or a client, assign someone and a due date. The history of actions and the costs stay with the fault, even after it is closed.

WHY IT MATTERS

Every report needs a follow-up

Record the location and priority of the fault, assign someone and keep the history of changes.

PROBLEMSOLUTIONRESULT

01 / A CHALLENGE IN PRACTICE

A report from the spot

A photo and the zone make it easier to pass on information about the fault.

Record the location and description of the fault and attach the photo the assignee needs.
02 / A CHALLENGE IN PRACTICE

Assignment with a due date

After a report, you need a person responsible and a due date for the next steps.

Assign the person responsible and set a date for dealing with the matter.
03 / A CHALLENGE IN PRACTICE

Equipment linked to the fault

The equipment history and the service date help you prepare the repair.

Go back to the history and service dates of the equipment linked to the fault.
HOW A COMPANY USES IT

A small detail matters to the client

A broken door handle or faulty equipment needs a response. Pass the matter to the right person and come back to its status.

A SITUATION MANY COMPANIES KNOW

A client reports a fault at the property

Assigning the report and a due date helps you come back to the matter and tell the client what happens next.

WHAT THE SYSTEM CHANGES
  1. 01A report with the property, zone and attachments
  2. 02Assignment, due date and change history
  3. 03Equipment breakdowns reported from the equipment record
WHAT IT COVERS

Take in the report and plan the next step.

Record the fault, set its priority and assign someone. You will come back to urgent and overdue matters on the dashboard.

FAULTPRIORITYCONTRACTORCOST

Report

Describe where the fault is and add photos. A report can also concern equipment or come from a client.

Priority and status

Set the priority and update the status of the matter from report to closure.

Assignee and due date

Assign the person responsible and a due date. You can check urgent and overdue matters on the dashboard.

External contractor

Record the details of the external service company on the fault if it is the one handling the repair.

History and costs

Go back to the history of the report. Repair costs are visible to people with the right permission.

WHAT YOU GAIN

Come back to the fault from the first report to the repair.

In the portal, the client will see the open faults you choose to share with them.

REPORTDUE DATEHISTORY

Staff member photographing a fault in a building corridor
A report with a photo

A description, the location and a photo will help the assignee prepare for the repair.

Property fault history

Go back to the changes and remarks when you want to look at earlier reports on a property.

Cost of repairs

You include repair costs in the contract result. They are available to people with permission to see finances.

ON SCREEN

The history of a fault from report to repair.

Go back to the location, the due date and the information passed to the assignee.

FAULTHISTORYCOST

01 / FAULT

Fault record with history and cost

Go back to the location of the report, the due date, the assignee and the repair history. People with access to finances can also see the recorded costs.

  • You know who is handling the fault, by when, and whether someone external is doing it.
  • The repair cost and the change history stay with the report.
Record of the fault “Leaking basin tap” with the status In progress, priority High, assignee, external contractor, due date, a cost of PLN 285.00, emergency contact and the History tab with two entries.
HOW THE MODULE WORKS IN PRACTICE

From reporting a fault to closing it

From a fault someone noticed to a closed matter with its cost.

DATAWORKDECISION

  1. 01

    Record the report

    Choose the property and the location of the fault, add a description and a photo. A client can also send a report through the portal.

  2. 02

    Assign someone

    Choose a member of your team or record the details of an external contractor, and set a due date.

  3. 03

    Follow the repair

    Keep the report status and remarks up to date so you can easily go back to what has been done.

  4. 04

    Close the matter

    Once the repair has been checked, close the report. A person with access to finances can record its cost.

ACCOUNT

Record the report on the right property.

Add a fault, choose the person responsible and see how to go back to the history of how it was handled.

The account is for businesses only and does not require a payment card.

Create an account