01What it is
A list has a name (unique in the company), a description, a status and points. You enter the points one per line, up to 80 per list. New work requires an active list.
A task receives its own copy of the points when it is created. If you change the template later, tasks that already exist stay as they are.
The assignee ticks off the points in the execution view, on the Checklist tab. You can tick points only in a task that is not done yet. You can finish the task only after ticking the full set.
- UP TO 80 POINTS
- Each point is one line of text.
- COPY IN THE TASK
- Changing the template does not change tasks that already exist.
- THE FULL SET
- Finishing a task requires every point to be ticked.
02Tasks step by step
- STEP 1Open Cleaning and go to the Checklists tab.
- STEP 2Add a list and enter a name and a description.
- STEP 3Enter the points, one per line.
- STEP 4Save with the active status.
- STEP 1Open a cleaning task from the task list.
- STEP 2On the Checklist tab, tick off the points you have done and save.
- STEP 3Once the full set is ticked, finish the task.
03What it connects to
Cleaning plans
A recurring plan points to a checklist.
Go to the topicCleaning plansQuality checks
A finished task goes to a quality check.
Go to the topicQuality checksSupplies usage
You record supplies usage in the same execution view.
Go to the topicSupplies usage